欧美熟妇另类久久久久久不卡_国产成人综合亚洲看片_西西人体444www大胆无码视频_特黄aaaaaaaaa毛片免费视频_国产成人av一区二区三区不卡

Milestones achieved at Desheng V-Ti Metals Industry Park

Date:2024/3/22 Source: CISDI

The creation of a new mega steel plant for China’s Yunnan Province is progressing rapidly.

The plant, at Desheng V-Ti Metals Industry Park, is projected to produce 2.06 million tonnes of liquid steel and around 62,000 tonnes of vanadium slags a year. Its continuous casting plant will produce 2 million tonnes of slabs annually.

A basic oxygen furnace has been pushed into position, allowing the immediate installation of an overhead crane at the casting bay for the Park’s continuous casting plant.

The BOF features the self-adaptive constraint system CISDI-SACS, which is underpinned by 4-point linkage suspension expertise.

The patented sub-lance, model and robots at the ladle receiving position for casting, and the downstream BOF temperature measurement and sampling, will intensify the quality and smartness of the Park’s development.

 

The BOF is pushed into position at Desheng V-Ti Metals Industry Park

 

Other huge tasks undertaken by CISDI, the project’s EPC-based services provider, include the lifting of a 146-ton LDG holder top system some 54.456 metres in to the air to meet its designated position.

The holder has an 80,000 cubic metre volume, a 54m diameter body and a height of 62m.

Its design and construction will ensure the piston runs stably and at a high throughput rate, and can be easily operated and repaired.

 

Lifting the LDG holder’s top system into position at Desheng V-Ti Metals Industry Park